全屏通栏广告背景
全屏通栏广告背景
自定内容
Welcome to Zhuji Wanjiang Machinery Co., Ltd,Service Phone:18888711174
网站标志
导航菜单
全屏通栏广告背景
全屏通栏广告背景
当前位置
自定内容

PRODUCTS


产品详情
20 foot energy storage cabinet pipeline assembly

Pipeline assembly for energy storage equipment

1. Cooling pipe branch (water inlet pipe) - nylon pipeline
2. Cooling water branch pipe (outlet pipe) - nylon pipeline
3. Valve (manual)
4. Discharge port (one-way stop valve)
5. Cooling water main pipe (metal pipe, with a diameter of about 50, can be replaced with PE pipe, usually below the cabinet)
6. Cooling water main pipeline (metal pipe, with a diameter of about 50, can be replaced with PE pipe, usually below the cabinet)
7. Fire extinguishing pipe (metal pipe, temperature resistance above 1000 ℃.)
8. Liquid cooled air conditioning (components: air conditioning system, water pump, valve, heat exchanger, pipeline, etc.)

Scheme of liquid cooling Plumbing of energy storage tank:
The first level liquid cooling main pipe adopts ID50mm metal pipe or PE pipe, with a total length of about 15-20 meters;
The secondary liquid cooling pipeline adopts PA pipes with ID21mm or ID25, with a total length of about 40 meters;
The third stage liquid cooling pipeline adopts an ID14mm PA pipeline, with a total length of about 80 meters;
The connection method adopts SAE, VDA, or CQC quick plug connection.



全屏通栏广告背景
全屏通栏广告背景
导航菜单
自定内容
TECHNICAL SERVICE
自定内容
APPLICATION AREA
自定内容
PRODUCT CENTER
自定内容
自定内容
自定内容
自定内容

18888711174

TEL:18888711174 / 18657550002

ADDRESS:Yingdian Street, Zhuji City, Zhejiang Province  

Email:635548702@qq.com

自定内容
自定内容
CONTACT US
自定内容
自定内容
自定内容
自定内容
SCAN
脚注信息

All rights reserved © Zhuji Wanjiang Machinery Co., Ltd

导航菜单
导航菜单