全屏通栏广告背景
全屏通栏广告背景
自定内容
Welcome to Zhuji Wanjiang Machinery Co., Ltd,Service Phone:18257589633
网站标志
导航菜单
全屏通栏广告背景
全屏通栏广告背景
文章分类
当前位置
文章正文
Liquid cooled Plumbing scheme of energy storage tank
aythor:管理员    Published on:2023-06-30 16:08:13    words:【large】【mid】【small】read (2352)
abstract:The first level liquid cooling main pipe adopts ID50mm metal pipe or PE pipe, with a total length of about 15-20 meters; The secondary liquid cooling pipeline adopts PA pipes with ID21mm or ID25, with a total length of about 40 meters
The first level liquid cooling main pipe adopts ID50mm metal pipe or PE pipe, with a total length of about 15-20 meters;
The secondary liquid cooling pipeline adopts PA pipes with ID21mm or ID25, with a total length of about 40 meters;
The third stage liquid cooling pipeline adopts an ID14mm PA pipeline, with a total length of about 80 meters;
The connection method adopts SAE, VDA, or CQC quick plug connection.
全屏通栏广告背景
全屏通栏广告背景
导航菜单
自定内容
TECHNICAL SERVICE
自定内容
APPLICATION AREA
自定内容
PRODUCT CENTER
自定内容
自定内容
自定内容
自定内容

18257589633

TEL:18257589633 / 18657550002

ADDRESS:Yingdian Street, Zhuji City, Zhejiang Province  

Email:635548702@qq.com

自定内容
自定内容
CONTACT US
自定内容
自定内容
自定内容
自定内容
SCAN
脚注信息

All rights reserved © Zhuji Wanjiang Machinery Co., Ltd

导航菜单
导航菜单